Bridgeport Energy Project - Connecticut
340 MW simple cycle using Siemens V84.3a combustion turbine generator; commercial operation began in June 1998. Subsequently developed into 520 MW 2X1 combined cycle with Siemens V84.3a combustion turbine generator and Siemens triple pressure steam turbine generator; commercial operation began in June 1999. Dual fuel capability using oil added in 2001. Project was combined with modifications to existing 80 MW and 170 MW oil fired plants.