400 MW project using Siemens Power Generation 2.3 MW turbines.  Summit is assisting Cannon Power, the owner/developer, with this multi-phase project. 
Phase I, 136.6 MW, began commercial operation in October 2009.
Phase II, began commercial operation in December 2009.
Phase IIa, 59.8 MW, began commercial operation in January 2010.